Software that carries the load.

Lintel connects planning, cost control, site work and handover in one system, for builders working across the United States, Europe and Africa.

18,400 mm 9,200 mm L-204 · RFI 0412 resolved Level 2 slab: pour approved
Tower B, Level 2 · synced from site Rev. F

One system from first estimate to final handover.

Most projects run on five tools that never agree. Lintel keeps drawings, budgets, schedules and site records in a single model, so the office and the site read the same numbers.

Lintel PlanScheduling and resources

Build the programme once and keep it honest. Crews, equipment and deliveries are tied to the schedule, so a delay shows its knock-on effects before it reaches site.

  • Critical path and look-ahead schedules
  • Crew, plant and material loading
  • Import from Primavera P6 and MS Project

Lintel CostEstimating and cost control

Estimates become budgets, and budgets track against actual spend as invoices arrive. Variations are priced and approved in the same place they are raised.

  • Quantity take-off from drawings and models
  • Multi-currency budgets with locked rate dates
  • Change orders, retention and payment certificates

Lintel SiteField management

Daily reports, inspections, snags and RFIs captured on a phone, with or without signal, and attached to the exact drawing location.

  • Offline-first mobile app
  • Inspections and quality checklists
  • Photo records pinned to drawing coordinates

Lintel HandoverDocuments and closeout

Every approved drawing, certificate and warranty is filed as the work happens, so closeout is an export rather than a three-month hunt.

  • As-built and O&M manuals compiled automatically
  • Full audit trail on every document revision
  • Structured data for facilities systems

Built for sites where the network is not guaranteed.

Works without signal

Site teams keep recording when connectivity drops. Changes merge when the device reconnects, with conflicts shown to a person rather than silently overwritten.

Reads the local rulebook

Metric or imperial, local tax and retention rules, regional units and document conventions are set per project, not per company.

Runs in your region

Choose where project data is stored: United States, European Union or Africa. Support follows the sun from all three offices.

Three headquarters. One engineering team.

We are not a US company with a sales desk abroad. Product, engineering and customer teams sit in each region and work on the same roadmap.

Chicago

Headquarters, North America

Covers
United States, Canada
Teams
Platform engineering, enterprise sales
Contact
americas@lintel.example

Rotterdam

Headquarters, Europe

Covers
EU, United Kingdom, Middle East
Teams
Compliance, data and security
Contact
europe@lintel.example

Nairobi

Headquarters, Africa

Covers
East, West, Southern and North Africa
Teams
Mobile and offline engineering, customer success
Contact
africa@lintel.example

Security and standards

  • ISO 19650 information management
  • SOC 2 Type II
  • ISO 27001
  • GDPR and Kenya Data Protection Act
  • SSO via SAML and OIDC
  • IFC and BCF open formats

See your own project in Lintel.

Tell us about a live or upcoming project. We will set up a working demo with your drawings, your currency and your schedule.